How long does it take to build a website or app? Realistic timelines

Realistic timelines for business websites, web apps and mobile apps, what each phase takes, and the three things that delay almost every project.

4 min read

NirmaanCode technology illustration for How long does it take to build a website or app? Realistic timelines

"How long will it take?" has an honest answer, but it comes with conditions. The build itself is usually the predictable part. What stretches timelines is everything around it: decisions, content and feedback. Here's what typical projects look like, and where the time actually goes.

Typical timelines

These assume a clear scope, content arriving on time and feedback within a few days of each demo.

  • Landing page or microsite: 1 to 2 weeks

  • Company website, 5 to 15 pages, custom design: 4 to 6 weeks

  • Larger website with CMS, blog and integrations: 6 to 10 weeks

  • E-commerce store: 6 to 12 weeks depending on catalogue size and integrations

  • Web app or portal, first version: 8 to 16 weeks

  • Mobile app, first version on iOS and Android: 10 to 20 weeks, plus store review time

Anyone promising a custom business website in three days is either reusing a template without changes or skipping testing. Both are fine if you know that's what you're buying.

Where the time goes

Discovery and scope (about a week)

A call or two, a written scope, a quote. Short, but skipping it is the most expensive shortcut in the business.

Structure and wireframes (1 to 2 weeks)

Sitemap, page outlines and simple wireframes that show what goes where, before any colours. Changes here take minutes. The same changes after visual design take days.

Visual design (1 to 3 weeks)

Home page first, then inner page templates. Each revision round adds time, so consolidated feedback from one decision-maker speeds this up enormously.

Development (2 to 8 weeks or more)

Building pages, components, the CMS, forms and integrations. For apps, this is the longest phase and runs in cycles with demos at the end of each one.

Content (runs in parallel, or not at all)

Text, images, product data. This is the phase that most often blocks launch, because it's the one nobody owns.

Testing and SEO setup (1 to 2 weeks)

Real phones, slow connections, forms, payments, browsers. Titles, descriptions, sitemap, Search Console, analytics.

Launch and handover (a few days)

DNS, hosting, monitoring, training, documentation.

The three things that delay almost every project

  1. Content arriving late. Decide on day one who is writing what and by when. If the answer is "we'll get to it", budget for the agency to write it.

  2. Slow or conflicting feedback. Five people with five opinions on a design turns a one-week phase into a month. Name one decision-maker.

  3. Scope growing quietly. "Can we also add..." is normal. Just agree that each addition gets a time and cost before it's built.

A project with a clear scope, a single decision-maker and content ready on time will usually land within the estimate. A project missing all three can take twice as long, and the extra time is rarely the development.

How to keep your project on schedule

  • Approve wireframes before design, and design before development

  • Reply to demo links within two or three working days

  • Send content in batches as it's ready, not all at the end

  • Keep a short list of "after launch" ideas instead of adding them mid-build

  • Agree a launch date, then work backwards with milestones

App store review

For mobile apps, add a week for the first review on the App Store and Google Play. Rejections happen, usually for small policy issues, and each round-trip costs a few days. Plan the launch date around the review, not before it.

If you have a real deadline

Tell the agency on the first call. A trade show, a funding round or a launch event changes how the project should be planned: often a smaller phase one that's live in time, with the rest following. That's much better than a rushed full build that launches late and broken. If you're deciding what to cut, our guide to scoping an MVP will help.

Our written scopes include a milestone timeline, so you know what's happening each week. Tell us about your project and we'll give you a realistic date, not a hopeful one.